Project Overview
Home | Project Overview
Mining Gold Construction
PT. Nawasena Adhya Utama
Nawasena Group was established in 2023 and has been involved in the natural resources industry, focusing on gold, nickel, and iron ore.

Gold Mining Operations


In its gold mining activities, In November 2023 Nawasena Adhya Utama Accuisision Hunamas Group . The group operates through three subsidiaries with Business Licenses (IUP) for the utilization, production, and processing of gold, silver, and by-products, covering a total area of 3,770.23 hectares:
- PT Karya Tambang Abadi (2 Production Operation IUPs)
- PT Palapa Bumi Minerai (2 Production Operation IUPs)
- PT Puncak Mercusuar (5 Production Operation IUPs)
The Production Operation Licenses (IUP OP) were issued in January 2025 until January 2040 , with an initial validity of 15 years, extendable up to 45 years. Nawasena Adhya Utama concession area is categorized as an Area for Other Land Use (APL).
Exploration Studies
Exploration studies began in 1990, conducted by Signet Engineering, Australia. The drilling operations reached a total depth of 32,000 meters, comprising 247 drill holes. Based on exploration studies in the Pasir Keusik area, the gold resources are estimated at 1,332,980 tons of gold ore, equivalent to about 33 tons of gold (321,500 troy ounces of gold), with an average gold grade of 10 ppm distributed across 9 vein sections.
The ore body type includes both mixed and refractory ore, with mineral enrichment forming block structures, with an estimated ore body thickness reaching up to 70 meters in certain zones.
GOLD MINING RESUME
PT. NAWASENA ADHYA UTAMA
SITE SUKABUMI, WEST JAVA – INDONESIA
Location:
Simpenan District, Ciemas District and Waluran District, Sukabumi Regency, West Java Province, Indonesia.
Reserves:
Gold resources are 3,932,523 tons of gold ore or around 33,965,495 grams of gold. Average gold content 10 ppm (10 gr/ton)
Exploration Permit:
The exploration permit already exists and has been upgraded to IUP-OP (Ijin Usaha Pertambangan – Operasi Produksi).
IUP-OP No 503.8/90-BPPT/2010, date 06 Januari 2010 until 6 Januari 2025
IUP-OP No 503.8/91-BPPT/2010, date 06 Januari 2010 until 6 Januari 2025
IUP-OP No 503.8/92-BPPT/2010, date 06 Januari 2010 until 6 Januari 2025
IUP-OP No 503.8/93-BPPT/2010, date 06 Januari 2010 until 6 Januari 2025
IUP-OP No 503.8/94-BPPT/2010, date 06 Januari 2010 until 6 Januari 2025
IUP-OP No 503.8/95-BPPT/2010, date 06 Januari 2010 until 6 Januari 2025
IUP-OP No 503.8/96-BPPT/2010, date 06 Januari 2010 until 6 Januari 2025
IUP-OP No 503.8/97-BPPT/2010, date 06 Januari 2010 until 6 Januari 2025
IUP-OP No 503.8/98-BPPT/2010, date 06 Januari 2010 until 6 Januari 2025
Grade :
Average gold content 10 ppm (10 gr/t).
Valuation :
The total valuation is approximately USD 2,2 Billion
Current Investment Situation :
The mine is currently in the process of extending its permit.
Water, Electricity, and Roads
Water and electricity are fully available, the location is close to the highway with safe and convenient transportation access
Current Mining Operations
Currently this mine not yet in production, the production plan in January 2025 is 10,000 tons of gold ore with a production result of 80 kg of gold per-month.