Project Overview

Home | Project Overview

Mining Gold Construction

PT. Nawasena Adhya Utama

Nawasena Group was established in 2023 and has been involved in the natural resources industry, focusing on gold, nickel, and iron ore.

img pt nawasena (5)

Gold Mining Operations

img pt nawasena (10)
cropped-fav-nawasena.png

In its gold mining activities, In November 2023 Nawasena Adhya Utama Accuisision Hunamas Group . The group operates through three subsidiaries with Business Licenses (IUP) for the utilization, production, and processing of gold, silver, and by-products, covering a total area of 3,770.23 hectares:

  • PT Karya Tambang Abadi (2 Production Operation IUPs)
  • PT Palapa Bumi Minerai (2 Production Operation IUPs)
  • PT Puncak Mercusuar (5 Production Operation IUPs)

The Production Operation Licenses (IUP OP) were issued in January 2025 until January 2040 , with an initial validity of 15 years, extendable up to 45 years. Nawasena Adhya Utama concession area is categorized as an Area for Other Land Use (APL).

Exploration Studies

Exploration studies began in 1990, conducted by Signet Engineering, Australia. The drilling operations reached a total depth of 32,000 meters, comprising 247 drill holes. Based on exploration studies in the Pasir Keusik area, the gold resources are estimated at 1,332,980 tons of gold ore, equivalent to about 33 tons of gold (321,500 troy ounces of gold), with an average gold grade of 10 ppm distributed across 9 vein sections.

The ore body type includes both mixed and refractory ore, with mineral enrichment forming block structures, with an estimated ore body thickness reaching up to 70 meters in certain zones.

GOLD MINING RESUME

PT. NAWASENA ADHYA UTAMA

SITE SUKABUMI, WEST JAVA – INDONESIA

Location:

Simpenan District, Ciemas District and Waluran District, Sukabumi Regency, West Java Province, Indonesia.

Reserves:

Gold resources are 3,932,523 tons of gold ore or around 33,965,495 grams of  gold. Average gold content 10 ppm (10 gr/ton)

Exploration Permit:

The exploration permit already exists and has been upgraded to IUP-OP  (Ijin Usaha Pertambangan – Operasi Produksi).

Mining Permit

IUP-OP No 503.8/90-BPPT/2010, date 06 Januari 2010 until 6 Januari 2025

IUP-OP No 503.8/91-BPPT/2010, date 06 Januari 2010 until 6 Januari 2025

IUP-OP No 503.8/92-BPPT/2010, date 06 Januari 2010 until 6 Januari 2025

IUP-OP No 503.8/93-BPPT/2010, date 06 Januari 2010 until 6 Januari 2025

IUP-OP No 503.8/94-BPPT/2010, date 06 Januari 2010 until 6 Januari 2025

IUP-OP No 503.8/95-BPPT/2010, date 06 Januari 2010 until 6 Januari 2025

IUP-OP No 503.8/96-BPPT/2010, date 06 Januari 2010 until 6 Januari 2025

IUP-OP No 503.8/97-BPPT/2010, date 06 Januari 2010 until 6 Januari 2025

IUP-OP No 503.8/98-BPPT/2010, date 06 Januari 2010 until 6 Januari 2025

Grade :

Average gold content 10 ppm (10 gr/t).

Valuation :

The total valuation is approximately USD 2,2 Billion

Current Investment Situation :

The mine is currently in the process of extending its permit.

Water, Electricity, and Roads

Water and electricity are fully available, the location is close to the highway with  safe and convenient transportation access

Current Mining Operations

Currently this mine not yet in production, the production plan in January 2025 is  10,000 tons of gold ore with a production result of 80 kg of gold per-month.

Mine Location

Measured Reserve Deposit Data
From Signet Engineering, Australia